Skip to content
Skip to project details

Puy du Fou / 2025 / Project Detail

Puy du Fou

The Morgana and Throne towers, structure through final paint, for a 3,000 m² stage seating 2,000 spectators.

Overview

The Morgana and Throne towers, structure through final paint, an integrated kinetic face inside the Morgana Tower, a sword-fighting magical tree, and island rockwork simulating ancient castle ruins, for a 3,000 m² stage seating 2,000 spectators. The show's quicksand illusion took third place at the blooloop 2025 Innovation Awards.

Place
Vendée, France
Company
Petro Art Productions
Role
General Foreman
Year
2025
Project Brief

L'Épée du Roi Arthur: Live Show Set, Vendée, France.

  • 3,000 m²
    Stage
  • 2,000
    Spectators
  • 2
    Towers
  • 3rd
    blooloop Innovation 2025
The Challenge

Make it read as real

A live show set has to read as natural rock, reef or carved stone up close, and still meet the structure, safety and schedule demands of a live build.

The Solution

Shaped and finished by hand

Scope on this project: towers, kinetic face, rockwork and show set. Delivered as General Foreman with Petro Art Productions.

The Outcome

A finished live show set at Puy du Fou, Vendée, France.

Key Features

01

Towers

Tall themed structures, built up from the frame to the finished surface.

02

Kinetic Face

A sculpted face with moving parts, built into the themed surface around it.

03

Rockwork

Artificial rock surfaces shaped and textured to read as natural stone at close range.

04

Show Set

Scenery for a live show, built to take the wear of daily performances.

Visual Gallery

17 photos

More from the build

Process

Typical build sequence for themed rockwork

  1. Design

    Forms, levels and colour references agreed from the concept or 3D design before work starts.

  2. Armature

    Steel bent and fixed to carry the final shape, with mesh tied over it as the base for the surface.

  3. Shotcrete

    Sprayed concrete built up over the mesh in layers to form the rock shell.

  4. Carving

    Texture, strata and cracks cut by hand while the surface is still workable.

  5. Paint

    Base coats, washes and dry brushing, worked until the surface reads as real.

Methods

Materials & Methods

Every build stands on its methods. These are the disciplines this project called on, from structure to final finish.

Core Layer
Foundation / Primary discipline

Towers

Tall themed structures, built up from the frame to the finished surface.

Role on siteGeneral Foreman
Scope
04

Disciplines on this build

Year
2025

Project year

Team
PAP

Petro Art Productions

  • L02
    Capability

    Kinetic Face

    A sculpted face with moving parts, built into the themed surface around it.

    ScopeIncluded
  • L03
    Capability

    Rockwork

    Artificial rock surfaces shaped and textured to read as natural stone at close range.

    ScopeIncluded
  • L04
    Finish

    Show Set

    Scenery for a live show, built to take the wear of daily performances.

    ScopeIncluded