Corals
Sculpted coral pieces that dress a reef scene.
Guimarães to everywhere, still building
0%
Burj Al Arab Aquarium / 2016 / Project Detail
450 m² of rockwork and 5,500 corals for the entrance aquariums and the Al Mahara tank.
450 m² of rockwork and 5,500 corals for the hotel's entrance aquariums and the Al Mahara tank.
Hotel Aquarium, Dubai, UAE.
A hotel aquarium has to read as natural rock, reef or carved stone up close, and still meet the structure, safety and schedule demands of a live build.
Scope on this project: corals, rockwork and luxury hotel. Delivered as Master in Artificial Rock Work with Pangea Rocks.
A finished hotel aquarium at Burj Al Arab Aquarium, Dubai, UAE.
Sculpted coral pieces that dress a reef scene.
Artificial rock surfaces shaped and textured to read as natural stone at close range.
Theming for a high-end hospitality setting.
10 photos
Typical build sequence for themed rockwork
Forms, levels and colour references agreed from the concept or 3D design before work starts.
Steel bent and fixed to carry the final shape, with mesh tied over it as the base for the surface.
Sprayed concrete built up over the mesh in layers to form the rock shell.
Texture, strata and cracks cut by hand while the surface is still workable.
Base coats, washes and dry brushing, worked until the surface reads as real.
Every build stands on its methods. These are the disciplines this project called on, from structure to final finish.
Sculpted coral pieces that dress a reef scene.
Disciplines on this build
Project year
Pangea Rocks
Artificial rock surfaces shaped and textured to read as natural stone at close range.
Theming for a high-end hospitality setting.