Skip to content
Skip to project details

Europa-Park / 2024 / Project Detail

Europa-Park

Rockwork reconstruction of the Austria area, the Tyrolean log flume and the Alpine Express, plus façades in Croatia.

Overview

Rockwork reconstruction of the Austria area's Yomi Adventure Trail, the Tyrolean log flume and the Alpine Express 'Enzian', plus façade work in the Croatia area behind the Voltron Nevera coaster.

Place
Rust, Germany
Company
Petro Art Productions
Role
General Foreman
Year
2024
Project Brief

Austria & Croatia Area: Area Reconstruction, Rust, Germany.

  • 2
    Park areas
  • 3
    Attractions
  • 2024
    Built
The Challenge

Make it read as real

A area reconstruction has to read as natural rock, reef or carved stone up close, and still meet the structure, safety and schedule demands of a live build.

The Solution

Shaped and finished by hand

Scope on this project: reconstruction, rockwork, facades and log flume. Delivered as General Foreman with Petro Art Productions.

The Outcome

A finished area reconstruction at Europa-Park, Rust, Germany.

Key Features

01

Reconstruction

Repair and rebuild of existing themed rock to match the original look.

02

Rockwork

Artificial rock surfaces shaped and textured to read as natural stone at close range.

03

Facades

Themed building fronts finished as stone, plaster or aged surfaces.

04

Log Flume

Rockwork shaped around a water ride's channel and splash zones.

Visual Gallery

08 photos

More from the build

Process

Typical build sequence for themed rockwork

  1. Design

    Forms, levels and colour references agreed from the concept or 3D design before work starts.

  2. Armature

    Steel bent and fixed to carry the final shape, with mesh tied over it as the base for the surface.

  3. Shotcrete

    Sprayed concrete built up over the mesh in layers to form the rock shell.

  4. Carving

    Texture, strata and cracks cut by hand while the surface is still workable.

  5. Paint

    Base coats, washes and dry brushing, worked until the surface reads as real.

Methods

Materials & Methods

Every build stands on its methods. These are the disciplines this project called on, from structure to final finish.

Core Layer
Foundation / Primary discipline

Reconstruction

Repair and rebuild of existing themed rock to match the original look.

Role on siteGeneral Foreman
Scope
04

Disciplines on this build

Year
2024

Project year

Team
PAP

Petro Art Productions

  • L02
    Capability

    Rockwork

    Artificial rock surfaces shaped and textured to read as natural stone at close range.

    ScopeIncluded
  • L03
    Capability

    Facades

    Themed building fronts finished as stone, plaster or aged surfaces.

    ScopeIncluded
  • L04
    Finish

    Log Flume

    Rockwork shaped around a water ride's channel and splash zones.

    ScopeIncluded