The part of the job that never changes
How I Think
Every build is different: a reef tank in Lithuania, a boat ride in Poitiers, an island at Chester Zoo. What I bring to each one stays the same. Talk straight to the people on the job, make the rock read as real, and run the site so the crew can do its best work.
Communicator first, sculptor second Started behind a camera, stayed for the stone Steel, mesh, concrete, carving, paint Talking straight
Communicator first, sculptor second
Most problems on a build are people problems before they are rock problems. I say what is happening early and plainly, to the client, the designer and the crew. The habit comes from years of running events and dealing with clients directly.
Reading as real
Built to read as real
Artificial rock only works when nobody stops to think it is artificial. Every face is carved and painted against the real thing, one panel at a time, until it reads as stone, reef or cave.
Running the site
Organise the job properly
A good finish starts with a good plan. Materials on time, the right hands on the right panel, safe access for everyone, and a clean handover when the last coat is dry.